You are here

Error message

  • Notice: Undefined index: #object in field_formatter_class_preprocess_field() (line 70 of /var/www/vhosts/tecnoclimaspa.com/httpdocs/sites/all/modules/field_formatter_class/field_formatter_class.module).
  • Notice: Trying to get property of non-object in eval() (line 3 of /var/www/vhosts/tecnoclimaspa.com/httpdocs/sites/all/modules/views/plugins/views_plugin_argument_default_php.inc(66) : eval()'d code).

MIR Diamond mine

RUSSIA
Year: 2003
Series: SC
Total Power: 100.000 kW
Request: 
  • Heating and ventilation of the diamond mine Mir, the biggest in the world.
  • Suitable f or use i n potentially explosive atmospheres.
  • Treatment of 100% fresh air at −60°C.
  • Conformity to the very strict Russian norms concerning mining plants.
Solution: 
  • 90 air heating sections SC series.
  • Total air flow rate 4.800.000 m3/h.
  • Combustion chamber in stainless steel AISI 321 and heat excha nger in AISI 316L.
  • Welds with passivation treatment, certified for air at −60°C.
  • Heat exchanger very rigorously tested for leaks.
Advantages: 
  • Suitable for operating in extreme conditions (−60°C).
  • Highest reliability and safety of operation.
  • Low manteinance and maximum service life.
  • Very high efficiency with condensing operation.
  • Compliance with the very strict Russian norms concerning mining plants.
  • Compliance with the very strict requirements of the Russian certification system.
MIR Diamond mine